Concrete Calculator

Work out the concrete and bags needed for slabs, paths and footings.

Last updated 2026-11-28 · How we calculate this

Enter the Areas

Measurement system

Area 1

Enter the rectangle length.
Enter the rectangle width.
Enter a thickness greater than zero.

Optional, 0% to 50%. Starts at 0%.

Currency labels your figures; it does not convert exchange rates.

Concrete Estimate

Complete an area and thickness to see the estimate.

This is a planning estimate, not a structural design. It does not choose a thickness, reinforcement, sub-base or frost protection, or check building regulations. Confirm bag yields, delivery and minimum loads with your supplier, and the design with a qualified professional where needed.

Quick Answer

Concrete needed is the area multiplied by the thickness. A 10 ft × 10 ft slab 4 in thick needs 33.33 cubic feet, about 1.23 cubic yards, which is 56 bags that each yield 0.60 cubic feet.

How to Use This Calculator

Add each slab, path or footing as a named area and choose its shape, then enter the thickness of concrete. Add a waste allowance if you want extra for uneven ground or spillage. Enter the yield printed on the bag to see how many bags to buy, or use the volume to compare a ready-mix quote. The result is a planning estimate, not a structural design.

  1. Split the job into rectangles, circles or triangles that do not overlap.
  2. Enter each area's measurements and the thickness of concrete.
  3. Add a waste allowance if you want extra.
  4. Open "Plan a supplier order" and enter the bag yield, and a price per bag if you want a cost.

The Formula

Volume = total area × thickness × (1 + allowance % ÷ 100); Bags = volume ÷ yield per bag, rounded up

The areas are added at full precision and multiplied by the thickness to give the volume. The allowance is applied once, and bags are rounded up once at the end, so rounding does not inflate the order. In metric mode the calculator converts exactly (1 ft is 0.3048 m, 1 cu yd is 27 cu ft and 1 m³ is 1,000 L).

Worked Example

A 10 ft × 10 ft slab is 100 sq ft. At 4 in thick, that is 100 × 4 ÷ 12 = 33.33 cu ft, or 33.33 ÷ 27 = 1.23 cu yd. With bags yielding 0.60 cu ft, 33.33 ÷ 0.60 = 55.6, so you need 56 bags. With a 10% allowance the volume is 36.67 cu ft, which is 62 bags.

Metric check: a patio base 3 m × 2.5 m at 100 mm thick is 3 × 2.5 × 0.1 = 0.75 m³, or 750 L. With bags yielding 10 L, that is exactly 75 bags.

Post hole: a round hole 300 mm across and 600 mm deep holds π × 0.15² × 0.6 = 0.0424 m³, about 42.41 L. With 10 L bags that is 5 bags per hole.

Frequently Asked Questions

How thick should my slab be?

The calculator does not choose a thickness. The right figure depends on what the slab carries, the ground beneath it and local building rules, so follow your local guidance, your supplier or an engineer, then enter that thickness.

How much concrete does one bag make?

It depends on the product, so use the yield printed on your bag. As an example, the QUIKRETE Concrete Mix data sheet gives about 0.60 cu ft for an 80 lb bag, 0.45 cu ft for 60 lb and 0.30 cu ft for 40 lb, while one UK supplier quotes about 0.01 m³ for a 20 kg general purpose bag.

Should I use bags or ready-mix?

Bags suit small jobs such as posts and small pads. Larger pours are often cheaper as ready-mixed concrete, sold by the cubic yard or cubic meter. One cubic yard is 27 cu ft, which is 45 bags at 0.60 cu ft each, so compare the total cost, including delivery and any minimum load, before deciding.

What if parts of the job are different thicknesses?

Work them out separately, for example a slab and a thicker edge or footing, and add the results. Each run uses one thickness for all its areas.

Do I subtract the post from a post hole?

Strictly, yes, but leaving it in gives a small margin. A 100 mm square post standing 600 mm deep in the concrete takes up 0.1 × 0.1 × 0.6 = 0.006 m³, which is 6 L, less than one bag.

Why might I need more than the calculator says?

Ground that dips below the formwork, formwork that bows outwards and spillage all use extra concrete. Measure the depth in several places and add an allowance that suits your site.

Sources: NIST Guide to SI, Appendix B (conversion factors); QUIKRETE, Concrete Mix (No. 1101) data sheet; FP McCann, General Purpose Concrete product information