Sod / Turf Calculator

Measure your lawn and see how many rolls or slabs of sod to order.

Last updated 2026-11-15 · How we calculate this

Your Lawn

Measurement system

Optional, 0% to 50%. Five percent is an example, not a guarantee.

Plan a supplier order (optional)Add your supplier's roll size and price to see how many to order and what it costs.

Formatting only; no currency conversion is performed.

Turf Estimate

Your turf estimate will appear here. Complete each named lawn area to see the project total.

This is a planning estimate. It does not check stock, tax, load capacity, access, installation or whether a turf variety suits your lawn. Packaging and extension guidance vary by region, so confirm the product, coverage, preparation and timing with your supplier or a local horticultural source.

Quick Answer

Measure each lawn's length and width, subtract any beds or paths inside it, add a small cutting allowance, then divide by the area one roll covers and round up. A 30 ft × 20 ft lawn is 600 sq ft, or 630 sq ft with 5% extra.

How to Use This Calculator

Sod and turf are two names for rolls, slabs or pieces of living grass. Enter each lawn or repair patch as its own named area, add any beds or paths inside it as exclusions, then choose a cutting allowance. If you know what one roll or pallet covers, add it to see how many to order. The result is a planning estimate to check against your supplier's real packaging.

  1. Sketch the lawn and split odd shapes into rectangles and circles that do not overlap.
  2. Enter each area's length and width, a circle's diameter, or a known area from a plan.
  3. Enter beds, paths or trees inside the lawn once, as an exclusion.
  4. Choose an allowance, then add the coverage of one roll (and a pallet if you buy that way).

The Formula

Turf needed = (lawn area − exclusions) × (1 + allowance % ÷ 100)

Rectangle area is length × width. Circle area is π × (diameter ÷ 2)². All the named areas are added together first, the allowance is applied once to the total, and only then is the figure rounded up to whole rolls or pallets. The measured lawn never changes: the allowance is extra turf, not extra land. In metric mode the calculator converts exactly (1 ft is 0.3048 m).

Worked Example

A 30 ft × 20 ft front lawn is 600 sq ft. With a 5% allowance the extra is 30 sq ft, so you need 630 sq ft. If one roll covers 10 sq ft, that is 630 ÷ 10 = 63 rolls. If a pallet covers 450 sq ft, 630 ÷ 450 = 1.4, so 2 pallets cover 900 sq ft with 270 sq ft left over.

Example prices (fictional, not a quote): at $5 per roll plus $40 delivery counted once, 63 rolls cost 63 × $5 + $40 = $355. Two pallets at $190 each plus the same delivery cost $420.

Metric check: an 8 m × 6 m lawn is 48 m². With 5% extra that is 50.4 m², which is 51 rolls of 1 m², supplying 51 m² with 0.6 m² left over.

Frequently Asked Questions

How much extra turf should I order?

Many people add a small allowance for cuts, curves and trimming. Five percent is an example, not a rule: diagonal cuts, pattern matching, damage and installer practice can all change it. Ask the grower or installer when the site is unusual.

Do I subtract flower beds and paths?

Only the ones inside the lawn outline, and only once. If you already drew a bed outside the lawn boundary, it is not part of the lawn, so do not subtract it again. With several lawns, attach each exclusion to the area that contains it.

How big is a roll or a pallet?

There is no universal size. One supplier sells by the square meter, another by rolls or slabs, another by whole pallets. A UK supplier may quote rolls by area, an Australian one 1 m² rolls or 0.5 m² slabs, a Canadian one pieces of about 10 sq ft. Use the figures for the product you are buying.

Why do two small patches not need two rolls?

Because the patches are added together before rounding. Two 4 sq ft repair patches make 8 sq ft, which fits in one 10 sq ft roll. Rounding each patch separately would order too much.

What if my supplier has a minimum order?

Minimums are common and can differ between collection and delivery. A supplier may sell loose pieces for collection but require a full pallet for delivery. A 25 m² project with a confirmed 30 m² minimum means ordering 30 rolls of 1 m², so ask before you rely on the area alone.

When should I order, and how soon do I lay it?

Prepare the site first: clear debris, fix drainage, level the soil. Then book delivery. Living turf is perishable, so follow the grower's instructions for unloading, laying and watering rather than a universal deadline, because climate and product differ.

Sources: NIST Guide to SI, Appendix B (exact foot conversion); University of California IPM, site preparation and ordering sod; Virginia Cooperative Extension, establishing lawns from sod.